Hi all,
I am facing a problem wherein I can see the below history in MD63. as can be deduced that there are 2 consumption done on 3rd march and 17th march. Against them there are 4 GR for the material around 11th march.
I have checked the MD73 for the withdrawal qty in Feb and Jan. however, I cant see any withdrawal qty in the month of March.
Has anyone seen such kind of behavior.
History on 3rd March qty reduced from 2 to 0 without change log stating there was GR reduction.
History on 17th March qty reduced from 4 to 2 without change log, stating there was GR reduction.
MD73 Current.
Thank you for your help
Suraj